Monday, April 9, 2012

Roof and Door/WindowFrames starting

aluminum sheets are now coming onto of the trusses.  This week, the rock wool insulation and Kliplock roof will come on this week.  Note also the door and window frames are now coming on.  So we should be expecting final brickwork and plastering within this 2 weeks.  This is a frantic time as I have to ensure all plumbing work, electrical conduits, alarm systems have to be built in before they put in the final plaster.

This shows the sheets on the trusses but with without the window/door frames.  Note the clearing next to the house.  The neighbor is also building his house.  A single storey detached house.







Front View
Front view
The front exposed brick wall is coming up.  A lesson in supervision, I was just in time to stop them putting up a wall in the lounge.  This was supposed to be a folding wooden wall.  They didn't read the plans!




Rear Right View
Rear Left View