Yep the last time I posted this was in May. Now its Oct. Last week I thought I had my contractor but at the last minute I found out through a misunderstanding that he did not include piling. I was very annoyed at the misunderstanding as this would mean the quote would escalate again! I have decided that I would get another quote from a small time sub contractor to see if there is sufficient variance. For your information the previous quote was RM 400,000. Thats does not include piling, flooring (& joists), fittings, windows and doors (although it includes labour for installing) and electrical. I thought it was a bit high. The dimensions was 3,000 sq ft inside but I have a large deck and a large garage.