Tuesday, March 8, 2011

Update

3rd March, back part of car porch and garage cleared. Ready for concrete pouring.  The 2nd pic shows the view from the front of the house. This would be what we would see from the kitchen.














8th March - The columns formwork goes up.  The left part of the pic shows the front part of porch being cleared for the beams to go in

Tuesday, February 22, 2011

Stained Glass Panels

I have always been fascinated by stained glass art.  I have already bought some stained glass lampshades.  My next project was a labour of love, 2 stained glass panels in the lounge.  I commissioned Helen Watson in New Zealand to design the 2 panels.  It arrived in Kuching in Jan 2011 after a few months in design and construction.

The first pic is the box, very well packed with MDF, polystyrene sheets and paper sheets. The 2nd pic is the 1st of the 2 panels.  This panel shows 3 birds. 2 wood pigeon and a fan tail.  There is some kiwi flora as well.  The bottom left showed part of an abstract cross for my wife.  Both panels have the cross.  The other panel has a pair of flying ducks on the top (representing the twins).  Altogether there are 7 birds for the 7 children. A very personal project.

Oh yes, I hope my wife is not reading this blog.  Its supposed to be a surprise!  When it is mounted, I am going to cover it up with plywood until it is ready to be unveiled.


Getting ready for driveway concrete and ground floor beams

The garage and back of driveway is ready for the concrete slab.  Rebars will go in after the piping are put in.  The raised beams for the ground floor is now being built and the raised slabs for the laundry and kitchen are also going up.  Note that the ground floor is raised 3 feet.  The Air Bricks have been handed to the contractor.  He will measure a box that will be sent into the beam so that the Air Brick can be placed in the gap when the beam is completed.  Note the workers.  They are mostly Indonesian (some from Sulawesi!) and they work hard ! Even after 6pm and on Saturdays as well.  It is a good idea whenever you visit the site, to bring some refreshment or lunch for the workers.  They are poorly paid and will appreciate treats.

Monday, February 14, 2011

Beams for concrete slabs done

The formwork has been removed.  The concrete slab for the driveway will go on top of this.  The 2nd pic shows building the formwork for the beams for the ground floor. Its raised 3 feet.

Tuesday, February 1, 2011

Foundation Completed, Starting on Beams

The foundation has been completed and it has cost me a bomb!  The piling required 60 feet of piles!  Hence the total costs for piling came up to more 60k!  This is certainly a wildcard and no contractor wants to commit themselves to a fixed cost.  Each pile require 3 poles !  The earth was certainly very soft and hence selection of land is important.


The next pic shows work ongoing work on the beams at ground level to support the driveway slabs. Apparently this is a council requirement these days.  You cant just lay concrete even if it re-inforced.


Monday, December 20, 2010

Work has started

Work started on 16th Dec 2010.  Piling has started!  62 feet ! That would require 3 piles per point !

Tuesday, October 26, 2010

What I have bought

I thought it would be nice if I share some of my ideas on detail work on the house.  In fact I have purchased some of these items.



  1. Air Bricks - these are cast iron ventilation grills as I have a 3 feet gap between the ground and floor.  I imported these from UK.  The site is www.castironairbricks.co.uk  The design is English Rose 
  2. Solar powered gable mounted ventilation fans - my attic has 2 ventilation fans to continuously extract the hot air and create moving air inside the house.  The fan is solar powered and has a flexible grill to close the vent when it is not working. The site is http://www.airvent.com/homeowner/products/powerVents-solarGable.shtml
  3. Stained Glass Lampshades for dining and kitchen. I got them from ebay.  Note that China makes a lot of them now.  I also commissioned a stained glass panel for the living room.  You must differentiate them from SGO or Stained Glass Overlay which are in fact fake stained glass through usage of plastic sheets and stick on lead strips.  Kuching has a SGO designer in Pending.  They can be nice too I guess for panels.
  4. Clothes Drier Vent - Due to occasional wet weather, a drier has been very useful to us.  However the hot air from the drier hasnt been pleasant circulating in the house. So for this new house I am putting in a vent through the laundry wall to the exterior.  I found this vent with a cap that will close if there is not air coming through (useful to keep insects out) in ACE Hardware in Midvalley Megamall in KL (3rd level).  The shop even have the accompanying ducts and accessories to connect to the drier. Note the cap to prevent rain entering and the flap inside. 
  5. Bathroom fittings - I got some complete set fittings for all the bathrooms from Houz Depot. This KL DIY shop is very interesting. They have 2 branches, a new one in Jln Tunku Abdul Rahman (opposite Pertama Complex) and the older one near The Curve.  The set includes mixer, shower, hose and external hand held shower unit.
Thanks all for the time being.